1.
The Planning Study of 145 MW Grid Connected Cirata’s Floating PV to Support the Security of Supply in Jawa Bali Power Systems. JTPEEP [Internet]. 2025 Aug. 2 [cited 2025 Oct. 15];1(1):55-66. Available from: https://jurnal-puslitbangpln.id/index.php/jtpeep/article/view/93