[1]
“The Planning Study of 145 MW Grid Connected Cirata’s Floating PV to Support the Security of Supply in Jawa Bali Power Systems”, JTPEEP, vol. 1, no. 1, pp. 55–66, Aug. 2025, doi: 10.33322/nt8fsb78.